Commissioning checklist

Part 4 — Operate and fix.


Work through this before handing an installation over. Most of it takes minutes; all of it is cheaper now than after the client has moved in.


29.1 The project

29.2 The central unit

Time zone deserves a second look. It silently shifts every schedule in the building by an hour, and nobody notices until the seasons change.

29.3 Function testing

Test physically, not by reading the project.

29.4 The awkward cases

The ones that come back as callbacks:

29.5 Handover


29.6 The last check

Connect and confirm:

"Projects are the same."

If it says "Projects are NOT the same!", the central unit is running something other than the file you are about to file away as the record of this installation. Resolve it before you leave.


Next: Chapter 30 — Troubleshooting.